The Mission of Bangalore Electricity Supply Company Limited (BESCOM) is to ensure complete customer satisfaction by providing its customer quality, reliable power at competitive rates
Low Tension 5
ELECTRIC POWER TARIFF - 2010
ELECTRIC POWER TARIFF - 2010

K.E.R.C ORDER DATED 7th December 2010

Retail Consumer Tariff Effective From

The First Meter Reading Date on or after 7th December 2010.
Low Tension Plans

TARIFF SCHEDULE LT-5

Applicable to Heating & Motive power (including lighting) installations of industrial Units, Workshops, Poultry Farms, Sugarcane Crushers, Coffee Pulping, Cardamom drying, Mushroom raising installations, Flour, Huller & Rice Mills, Wet Grinders, Milk dairies, Dry Cleaners and Laundries having washing, Drying, Ironing etc., Bulk Ice Cream and Ice manufacturing Units, Coffee Roasting and Grinding Works, Cold Storage Plants, Bakery Product Mfg. Units, KSRTC workshops/Depots, Railway workshops, Drug manufacturing units and Testing laboratories, Printing Presses, Garment manufacturing units, Bulk Milk vending Booths, Swimming Pools of local Bodies, Tyre retreading units, Stone crushers, Stone cutting, Chilly Grinders, Phova Mills, pulverizing Mills, Decorticators, Iron & Red-Oxide crushing units, crematoriums, hatcheries, Tissue culture, Saw Mills, Toy/wood industries, Viswa Sheds with mixed load sanctioned under Viswa Scheme, Cinematic activities such as Processing, Printing, Developing, Recording theatres, Dubbing Theatres and film studios, Agarbathi manufacturing unit., Water supply installations of KIADB & industrial units, Gem & Diamond cutting Units, Floriculture, Green House, Biotech Labs., Hybrid seed processing units. Information Technology industries engaged in development of hardware & Software as certified by the IT & BT Department of GOK/GOI, Silk filature units, Aqua Culture, Prawn Culture, Brick manufacturing units, Silk / Cotton colour dying, Stadiums maintained by Govt. and local bodies, Fire service stations, Gold / Silver ornament manufacturing units, Effluent treatment plants, Drainage water treatment plants, LPG bottling plants and petroleum pipeline projects, Piggery farms, Analytical Lab. for analysis of ore metals, Satellite communication centers, Mineral water processing plants / drinking water bottling plants and soda fountain units.  

RATE SCHEDULE

LT-5 (a): Applicable to Bruhat Bangalore Mahanagara Palike and Davangere City Municipal Corporation.
Fixed charges


  Fixed charges

i)  Rs. 25  per HP for 5 HP &  below
ii) Rs. 30 per HP for above 5 HP & below 40 HP
iii)Rs. 40 per HP for 40 HP & above but below 67 HP
iv)Rs. 110 per HP for 67 HP & above

  1. Demand based Tariff (optional)

Fixed charges

Above 5 HP and less than 40 HP

Rs. 50 per KW of billing demand

40 HP and above but less than 67 HP

Rs. 70 per KW of billing demand

67 HP and above

Rs. 160 per KW of billing demand

    1. Energy Charges

0 to 500 units

360 Ps/unit

501 to 1000 units

450 Ps/unit

Above 1000 units

470 Ps/unit

  LT-5 (b): Applicable to all Areas other than those covered under LT-5(a).

  1. Fixed charges

  Fixed charges

i)  Rs. 20  per HP for 5 HP &  below
ii) Rs. 25 per HP for above 5 HP & below 40 HP
iii) Rs. 35 per HP for 40 HP & above but below 67 HP
iv)Rs. 100 per HP for 67 HP & above

  1. Demand based Tariff (optional)

Fixed charges

Above 5 HP and less than 40 HP

Rs. 40 per KW of billing demand

40 HP and above but less than 67 HP

Rs. 60 per KW of billing demand

67 HP and above

Rs. 150 per KW of billing demand

iii. Energy Charges


0 to 500 units

360 Ps/unit

501 to 1000 units

420 Ps/unit

Above 1000 units

460 Ps/unit

   TOD Tariff applicable to LT5 (a) & (b):  At the option of the Consumer


Time of Day

Increase+ / reduction (-) in energy charges over the normal tariff applicable

22.00 Hrs to 06.00 Hrs

(-) 80 paise per unit

06.00 Hrs to 18.00 Hrs

0

18.00 Hrs to 22.00 Hrs

+ 80 paise per unit

NOTE:
1. Demand based Tariff
In the case of LT Industrial Consumers, Demand based Tariff at the option of the Consumer can be adopted. The Consumer is permitted to have more connected load than the sanctioned load. The billing demand will be the sanctioned load or Maximum Demand recorded in the Tri-Vector Meter during the month which ever is higher. If the Maximum Demand recorded is more than the sanctioned load, penal charges at two times the normal rate shall apply.
2. Seasonal Industries: The industries which intend to utilize seasonal industry benefit shall comply with the conditionalities under para no. 26 of general terms and conditions applicable to LT.
3. Electricity can also be used for lighting, heating, and air-conditioning in the premises.
4. In the case of welding transformers, the connected load shall be taken as (a) Half the maximum capacity in KVA as per the name plate specified under-IS1851 or  (b) Half the maximum capacity in KVA as recorded during rating by the Licensee, whichever is higher.

All Rights Reserved . 2010 © Government of Karnataka Webdesign by Ample Softwares